http://www.pacificorp.com/es/hydro/hl/condit.html#
Mt. Hood watches over the event |
A crowd gathered near the mouth of the White Salmon. The road next to the river going up to the dam was closed. The dam was finished in 1913 and blocks salmon and steelhead from traveling upstream (there is no fish ladder). After scheduling the dam removal this fall, some salmon were transported above the dam this month.
A few people perched on rocks overlooking the canyon.
Helicopters were monitoring the no-fly zone which had been established over the dam and lower river.
The bridge over the White Salmon on SR14 was closed just before noon. The hole was blown several minutes later (we did not hear the blast).
No barrier can stop a unicorn |
This is the view we had of the mouth of the White Salmon River |
It was a small surge that spilled up over part of a dock |
Then sediment and debris began to arrive. Large logs were carried downstream.
As we walked back to the car, we saw some of the logs floating downstream in the Columbia.
For exciting video of the dam breaching - click on the arrow below!
2 comments:
Is the rest of the dam still standing?
Yes, the hole was blown in the bottom as a tunnel and the rest of the dam will be removed later.
Post a Comment